General Company Operations Manual ICAO Annex 6 Part II General Aviation & CFR 91:

Details

Item#: GCOM-ICAO-ANNEX-6-PART-II-91-OPS Category

Includes the following documentation:

The General Company Operations Manual (GCOM) is for 14 CFR 91 Operators and Flight Departments seeking standardization, specific operational policy and company procedures in addition to compliance with ICAO Annex 6, Part II & CFR Part 91 General Aviation and the EASA SAFA 54 Item Ramp Inspection Checklist. The General Company Operations Manual is optimized for electronic viewing on both PC, EFB and iPAD. The necessary forms are included in the manual are designed to support the General Company Operations Manual. We handle all formatting and editorial matters during the entire process, allowing you to focus solely on the content of the manual. Source One Aviation Compliance provides editing, support, and revision service for the GCOM. SourceOne Aviation Compliance also offers a revision service so that when you have changes, we can update your manual for your flight department with a cost-effective solution. Company Logo added to Manual Cover (Client provided).

The following describes a typical outline for a GCOM with 14 CFR 91 and ICAO Annex 6, Part I/II and contains the following content:

  1. Introduction
  2. Amendment Control
  3. Departmental Organization
  4. Personnel Qualifications & Training
  5. Aviation Policy & Operational Control Procedures
  6. Fatigue Management
  7. SOPs (Standard Operational Procedures)
  8. Training Curriculum
  9. Hazardous Materials (Non-Carriage)
  10. Record Keeping, Maintenance Control System
  11. Weather Limitations
  12. Forms
  13. References
  14. Definitions & Acronyms
  15. Telephone Numbers
  16. Emergency Operations
  17. NTSB Accident/Incident Reporting
  18. Duty Time/Crew Rest Limitations for Fatigue Management

 

  • Complies with the ICAO Annex 6, Part II and the EASA SAFA 52 Item Ramp Inspection requirements with the following:
  • This Manual can be customized to your exact requirements and Company Specific while maintaining compliance with ICAO Annex 6 Part II Requirements.
  • Digital PDF Copy for PC, MAC, EFB, Tablet, or iPad.
  • Includes 10 hours of editing for client. Additional Editing later is only $50.00 per hour.
Price:

$1,800.00

Related Items

Our Products